Project Z Contacted ELS
Early 2011 -
Fightin' Phil Erected
Late September -
Roof Lifted Off
10am -
Second Piece
Lifted at 2:45 -
Call from Grace
Grace was asking if the lift was safe (line 54) 2:15 PM -
First Red Flag
3:10, missing fire ax (line 59) -
Second Green Flag
3:20 PM, line 62 -
Fightin' Phil Crashes
5 minutes after second green flag. -
Pre-Lift Checklists
7am by Micah Estratton